Plan 1-42 would result in a maximum increase in salinity of 0 - .99 ppt above US 17 and 0 - 1.83 below US 17 at flows of 6, 000 cfs. At flows ... Plan 1-42 assumes that all maintenance dredging for the present 38 foot channel would be completed prior to the new work dredging, ... upstream of the Fig Island Turning Basin, problems could arise with safety in the harbor and disruptions to shipping schedules.
Title | : | Savannah Harbor Comprehensive Study, Feasibility Report |
Author | : | |
Publisher | : | - 1991 |
You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.
Once you have finished the sign-up process, you will be redirected to your download Book page.
How it works: