If series 6 samples are not separated by size in the Region, a minimum of ten (10 ) bags of aggregate plus two (2) full bags of scalped material (3/4 to 1 inch)[1 9 mm to 25 mm] are to be submitted to the Testing Laboratory. If material is sampledanbsp;...
Title | : | Manual for the Michigan test methods (MTM's) |
Author | : | Michigan. Dept. of Transportation. Construction and Technology Division |
Publisher | : | - 2001 |
You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.
Once you have finished the sign-up process, you will be redirected to your download Book page.
How it works: